Dismantling, loading and transporting of the device from UAB Swedspan Girių bizonas headquarters.
Technological equipment electrical installation works at UAB Swedspan Girių bizonas wood chip production building.
Reconstruction of AB Nordic Sugar Kėdainiai sugar warehouse including installation of the packaging line.
Reconstruction of the administrative building of the Lithuanian Defence Ministry 3B/3P (Totorių st. 25/3), Vilnius.
Reconstruction of Public Institution Kaunas Service Industry Workers Professional Training Centre buildings, Karaliaus Mindaugo pr. 11 / Palangos st. 3, Kaunas.
Construction of Kaunas Regional camping grounds with a beach beside Lampėdžiai gravel pit, Raudondvario pl. 161 A, Raudondvario pl. 161 B, Kaunas.
Additional reconstruction of UAB Swedspan Girių bizonas formation unit, Boboard electrical installation work.
Reconstruction of the building “Creation of the engineering industry sector practical training centre”, Lakūnų st. 3, Vilnius.
Finishing construction and heritage protection works in Trakai Castle Peninsular aimed at its adaptation for tourism purposes.
Infrastructure reconstruction works at Prienai nursery school Pasaka.
Project “Complex adaptation of Birstonas resort cultural heritage for the development of tourism services”, B. Sruogos st. 4 and B. Sruogos st. 2, Birštonas.
Reconstruction work in Šlienava lower secondary school building.
Administrative, trade, residential building, Savanorių pr. 18, Vilnius.
Object AB Kaišiadorių paukštynas (Kaisiadorys poultry farm), Paukštininkų g. 15A, Kaišiadorys, waste water treatment plant equipment.
Major reconstruction work in Jonava District Municipality Culture Centre building 1C1p, Žeimių st. 13, Jonava.
Planning and construction of housekeeping and infrastructure buildings at Kaunas Medical University Clinics, Eivenių st. 2, Kaunas.
Administrative building, Savanorių pr. 241A, Kaunas.
Reconstruction of transformer station TP-7, Vištyčio st. 40, Kybartai.